MIKE 11 Hotfix 05-08-2008

This hot-fix is ONLY applicable for a CTI MIKE 11 installation. The hot-fix resolves an issue that arises when using a time step for the rainfall runoff component which is different form the hydrodynamic time step. The problem only occurs in a coupled (RR/HD) model.

FILE INFORMATION

File nameFile size
MIKEZERO_2008_080805.ZIP3.2 MB

Download from US East
- If you are from North America, Latin America, Europe, the Middle East or Africa:

Download from Singapore
- If you are from the Asia-Pacific region: